Gin Drinkers Bay Landfill Restoration, Hong Kong — OTAR® Ammonia Recovery Case Study

 

Location Gin Drinkers Bay, Hong Kong
Client Swire SITA Waste Services  
Technology

Landfill leachate ammonia stripper with thermal destruction

The Challenge

As part of the Gin Drinkers Bay Landfill Restoration project, Swire SITA Waste Services needed a complete ammonia stripping solution for landfill leachate, with influent ammonia concentrations of 4,000 mg/L requiring reduction to a discharge target of 100 mg/L. The project required a full turnkey scope: not just the stripping process itself, but the associated gas handling and destruction infrastructure needed to safely manage the by-products of treatment.

The Solution

Organics Group delivered the complete design, manufacture, installation, and commissioning of a 230 m3/day landfill leachate ammonia stripper between 1999 and 2000. The scope covered the full EPC lifecycle: detailed plant design, plant layout design, specification and selection of bought-in components, and the specification, design, build, and supply of all equipment. The installation included a migration gas flare, a fully enclosed thermal destructor, and complete gas handling equipment, all built and supplied within the plant design. Organics Group also carried out installation, start-up, commissioning, and operator training. The plant was later upgraded to a capacity of 480 m3/day in 2002 to meet growing site demand.

Technical specifications

Original capacity 230 m3/day
Upgraded capacity (2002) 480 m3/day
Influent ammonia concentration 4,000 mg/L
Effluent ammonia (design target) 100 mg/L
Key equipment Migration gas flare, fully enclosed thermal destructor, complete gas handling equipment
Scope of work Full EPC: detailed design, plant layout, equipment specification/build/supply, installation, commissioning, and training
Project timeline Work carried out 1999-2000; capacity upgrade in 2002

Why this project matters

  • Demonstrates Organics Group’s full turnkey EPC capability — not just the stripping process, but the complete gas handling and thermal destruction system around it
  • More than two decades of proven capacity growth, from 230 m3/day at commissioning to 480 m3/day after the 2002 upgrade
  • Shows OTAR®’s ability to scale with a site’s needs post-installation, rather than requiring a full system replacement
  • One of Organics Group’s earliest documented Hong Kong landfill ammonia stripping projects, reflecting a long-standing relationship with major waste management operators in the region

Want to know how OTAR® works?

See the full technology explainer, five-variant breakdown, and cost comparison on the OTAR® technology page.

What More Could Your Wastewater Deliver?

Evaluate the potential to recover ammonia and produce hydrogen while understanding the energy requirements and economics of your wastewater treatment process.

Free • Preliminary Estimate • No Commitment

Download the lead magnet

Join our mailing list to receive the latest news and updates from our team.

You have Successfully Subscribed!